Constructing Certainty: Will the Industry Finally Turn Good Advice into Better Delivery?

2 days ago
4 min read
Constructing Certainty reinforces the case for integrating contractors and specialist                            supply chains, before key project decisions are fixed.
Constructing Certainty reinforces the case for integrating contractors and specialist supply chains, before key project decisions are fixed.

The Centre for Construction Best Practice’s new publication, Constructing Certainty, is a welcome and timely contribution to the debate about improving UK construction.


Its central message is clear: contractors and specialist supply chains must be involved while important project decisions can still be influenced. Early Contractor Involvement should not be a procedural exercise. Done properly, it can improve buildability, manage risk and produce more reliable cost and programme expectations.


Drawing on 412 public-sector projects delivered by 55 contractors, the publication identifies a marked change in cost performance when contractor appointment moves beyond RIBA Stage 2. Projects with appointments at Stages 0–2 recorded average outcomes between 1.10% and 1.79% below the original client budget. Average cost growth increased to 8.56% at Stage 3 and 17.35% at Stage 4. The report identifies correlation rather than claiming that timing is the only cause, but the pattern deserves serious attention.


This direction was established decades ago

The evidence may be new, but the underlying principles are not.

Most organsiations and people that know me well, her me constantly talk about the 3 influential reports that established a clear direction for construction reform:


  1. Sir Michael Latham’s Constructing the Team, published in 1994, called for better teamwork, clearer project-management responsibilities, improved procurement and earlier involvement of contractors and specialists. (download report)


  2. Sir John Egan’s Rethinking Construction, published in 1998, called for committed leadership, customer focus, integrated processes and teams, quality and measurable performance improvement. It also recognised the need for project managers capable of integrating projects from conception through to delivery. (download report)


  3. Accelerating Change, published in 2002, reinforced the need for capable clients, integrated teams, long-term supply-chain relationships, performance measurement and continuous learning. It also challenged the industry’s continuing reliance on lowest-cost tendering. (download report)


Together, these reports described an industry in which projects would be managed as integrated delivery processes rather than divided into disconnected professional, commercial and construction packages. Yet too much of that advice was left on the shelf.


Late contractor appointment, fragmented responsibility, lowest-price decision-making and weak integration remain familiar problems. The industry appears to have accepted the language of reform more readily than the behaviours required to deliver it.


Constructing Certainty matters because it provides current evidence supporting what Latham and Egan had already identified: when delivery expertise enters too late, opportunities to influence buildability, cost, risk and programme have already been lost.


Why this matters to industrialised construction

This is particularly important for industrialised construction (IC). IC is often discussed in terms of systems, factories, products and digital technology. These elements matter, but they cannot compensate for weak project management or fragmented decision-making.

A manufactured or platform-based solution must be integrated with the client brief, design, planning, procurement, approvals, logistics, installation, assurance and building-performance requirements. If manufacturers and specialists are engaged after the design has effectively been fixed, much of their potential contribution has already been lost.


Selecting an industrialised construction system is not the same as establishing an industrialised delivery process. Nor should a manufacturer be expected to manage every interface across the wider development. This is why the project-management arm of industrialised construction is vital. It provides the leadership needed to coordinate participants, manage interfaces, allocate responsibilities, make timely decisions and transfer learning between projects. It si also a strong contender for managing the overall IC Patform required to coordinate the process and delivery mechanisms.


Connecting existing principles to current IDCC work

These issues are also reflected in my work with the UKRI Industrialising and Digitalising Construction Challenge Advisory Group (UKRI-IDCC).


The programme is seeking to address conditions that prevent industrialised approaches from operating consistently at scale, including fragmented demand, inconsistent requirements, incompatible systems and bespoke assurance processes. Its proposed Market Operating Model aims to establish clearer rules, roles and information structures for clients, suppliers, delivery organisations and assurance bodies.


Through Ottersbrook, I have put forward two related proposals for consideration.

The first is an Industrialised Construction Compliance Scheme. It would connect project management with accountable responsibilities, mandatory evidence and proportionate compliance gateways throughout the project lifecycle. The objective is to standardise the evidence and decision points required for dependable delivery without standardising away legitimate product and system innovation.


The second is a focused review of six years of evidence and learning from the Off-Site Homes Alliance (OSHA) for the Liverpool City Region Pathfinder. The proposed approach would identify what should be reused, updated, retired or tested on live schemes, helping the Pathfinder build on relevant previous work rather than repeat it.


The objective should not be another standalone report. It should be a working model that can be applied to real projects, supported by evidence and improved through delivery.


From evidence to action

Constructing Certainty recommends contracted early involvement by RIBA Stage 2 as the default for public-sector capital projects above £5 million. It also calls for stronger public-sector capability and mandatory value checks so that contracts are not awarded on lowest price alone. These are practical recommendations, but their value will depend on adoption and accountability. Early involvement must be genuine, properly scoped and supported by decision-making authority. Contractors, manufacturers and specialists must be able to influence the project, not merely attend meetings after the important choices have been made.


With an urgent need for new affordable housing, the industry cannot afford another well-received publication that briefly attracts attention and then disappears from practice and joins the other signifcant reports on the shelf.


The principles established by Latham and Egan remain sound. Constructing Certainty adds contemporary evidence and a measurable point of intervention. The opportunity now, including through the UKRI IDCC programme and Liverpool City Region Pathfinder, is to translate those principles into better procurement, stronger project-management behaviours and more dependable delivery. For industrialised construction, project management is not an optional supporting activity. It is the means by which new methods are coordinated, assured, tested and improved, turning industrialised capability into better-performing homes at meaningful scale.


Ottersbrook provides the project-management bridge between industrialised-construction ambition and assured delivery, helping clients, manufacturers and investors engage earlier, manage compliance and reduce avoidable project risk.

 
 
 